PTEC

Prefabricated Buildings

High-speed run

Structure components are connected to each other with bolts, wall and ceiling panels also using dry connection are mounted on structures and all components are made in factories such that installers don’t spend time to thinking.

The assembly and disassembly

We try that the welding operation don’t performed on place, all the components to be connected together without mortar and other coatings, so, during disassembly just twist must be opened then all elements will be separated.

The possibility of implementing different plans

Given the size of sandwich panels and the ability to use various steel profiles, implementation of buildings with small dimensions such as guarding and buildings with large dimensions such as gyms is simply possible.

Consultation

Design

Manufacturing

Run